How Many Workers Are Needed for a Tractor Final Assembly Workshop?

This is a manpower allocation plan for a tractor final assembly workshop, covering rear axle, gearbox, case assembly, pre-paint line, painting, and four final assembly lines as well as the test run section. It specifies the required number of personnel for each process when the daily output is 30 units and 40 units respectively. The total manpower needed is 135 people for 30 units per day and 180 people for 40 units per day, ensuring the rational arrangement of personnel to meet production needs.

Tractor Final Assembly Workshop

Tractor Final Assembly Workshop

Manpower Allocation Plan

Rear Axle Section

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Housing Line-on11
2External Assembly
3PTO Shaft Sub-assembly11
4PTO & Dual Gear Assembly1
5Dual Gear Sub-assembly22
6Small Bevel Gear Sub-assembly
7Differential Sub-assembly
8Left & Right Bearing Housing Bearing Press-fitting12
9Left & Right Bearing Housing Assembly
10Small Bevel Gear Assembly1
11Main & Driven Gear Clearance Adjustment
12PTO & Differential Lock Control Mechanism Assembly11
13Handbrake Assembly Assembly
14PTO Intermediate Shaft Assembly1
15Top Cover Assembly
16Brake, Gear Ring, Left & Right Drive Shaft & Stud Bolt Assembly22
17Line-off
18Planetary Gear Needle Roller Assembly22
19Planet Carrier Assembly
20Drive Shaft Bolt Press-fitting22
21Drive Shaft Sub-assembly
22Transfer Case Assembly11
23Housing Cleaning (Cleaning time: 1 min)
24Material Handler22
25Team Leader11
26Section Supervisor11
Total1721

Gearbox Section

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Housing Line-on11
2Parts Rack Line-on
3Release Fork Shaft Bushing Assembly
4Limit Seat, Rubber Plug & Cup Plug Assembly
5Countershaft Assembly & Pressure Plate Assembly11
6Output Shaft, Reverse Countershaft & Inner Gear Ring Assembly11
7Input Shaft & Auxiliary Countershaft Assembly & Clearance Adjustment11
8Creeper Planetary Carrier Sub-assembly11
9Creeper Assembly & Control Assembly11
101st–2nd, 3rd–4th Gear, Auxiliary Shift & Fork Shaft Assembly1
11Gearbox Side Control Mechanism Sub-assembly12
12Gearbox Side Control Mechanism Assembly11
13Stud Bolt Assembly
14Line-off
AdditionalKitting & Sub-assembly11
Material Handler11
Team Leader11
Total1113

Case Assembly Section

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Rear Case Assembly Line-on11
2Gearbox & Rear Case Docking & Upper Link Support Assembly11
34WD Transfer Case Assembly11
2WD Inspection Cover (Lower Cover) Assembly11
4Air Tightness Test12
5Release Bearing Sub-assembly12
6Release Bearing Assembly11
7Chassis Inspection & Hoisting Line-off11
8Chassis Running-in12
9Front Axle Assembly Sub-assembly12
10Material Handler11
11Team Leader11
Total1115

Pre-paint Line Section

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Engine Docking12
2Clutch Assembly11
3Chassis Line-on23
4Hitch Frame, Lower Link Bracket & Cylinder Bracket Bolt Assembly
5Chassis Number Marking, Inspection Cover & Screw Plug Assembly, Engine Fan Removal
6Hitch Frame Assembly, Cylinder Bracket Assembly & Limit Connecting Fork Weldment Assembly
7Upper Link Assembly, Cylinder Assembly, Lower Link Support Assembly & Chassis Oil Dipstick Assembly
8Upper Link Fixing Clamp & Diverter Valve Block Assembly11
9Lower Link, Limit Rod & Lift Rod Assembly
10Auxiliary Clutch Support Rocker Arm Assembly & Lift Assembly
11Battery Bracket Sub-assembly & Main Clutch Rocker Arm Sub-assembly11
12Front & Rear Floor Support, Battery Bracket, Main Clutch Rocker Arm & Chassis Number Rubbing Assembly
132WD Front Axle & Bracket Assembly11
14Drive Shaft Sub-assembly
154WD Front Axle & Bracket Assembly & Drive Shaft Assembly22
16Chassis Line-off
Material Handler11
Team Leader11
Total1113

Painting Team

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Chassis Line-off11
2Chassis Water Removal
3Pre-paint Masking11
4Chassis Painting22
5Masking Removal11
6Chassis Sealing11
7Hanging11
8Line-off
Team Leader11
Total88

Final Assembly Line 1

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Chassis Line-on11
2Right Front Wiring Harness & Sensor Assembly
3Upper Link Hook & Reflector Assembly
4Gear Pump & Constant Flow Pump Assembly12
5Lift Oil Pipe Assembly11
6Auxiliary Fuel Tank & Clutch Pull Rod Assembly11
7Return Oil Filter Assembly11
8Suction Filter Assembly11
9Steering Oil Pipe Assembly11
10Steering Cylinder Assembly11
11Distributor Assembly11
12Multi-way Valve Assembly12
13Steering Fuel Tank Assembly11
14Battery & Reverse Control Mechanism Assembly11
15Water Tank Assembly11
16Fan Blade & Water Tank Pull Rod Assembly11
17Pump Sub-assembly11
18Kitting23
19Material Handler22
20Team Leader11
21Section Supervisor11
Total2124

Final Assembly Line 2

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Hood Sub-assembly12
2Cab Installation & Ladder Assembly34
3Hood Assembly22
4Control Mechanism Connection22
5Throttle Cable & Control Lever Assembly12
6Brake Oil Pipe Connection & Muffler Assembly23
7Air Filter Assembly11
8Material Handler11
9Team Leader11
Total1417

Final Assembly Line 3

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Instrument Panel & Wiring Harness Assembly12
2Steering Wheel Assembly11
3Label Sticking12
4Nameplate Stamping11
5Tire Assembly & Torque Fastening34
6Line-off Oil & Water Filling & Toe-in Adjustment33
7Material Handler11
8Team Leader11
Total1215

Final Assembly Line 4

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Seat, Handbrake & Auxiliary Clutch Assembly12
2Hand Throttle & Foot Throttle Assembly12
3Rearview Mirror Assembly11
4Safety Frame & Breather Assembly11
5Steering Gear, Steering Oil Pipe & Brake Oil Pipe Assembly23
6Main Wiring Harness & Rear Light Harness Assembly11
7Material Handler11
8Team Leader11
Total912

Test Run Section

No.Process NameManpower for 30 units/dayManpower for 40 units/day
1Internal Grinding44
2Dialysis44
3Static Commissioning44
4Dynamic Adjustment44
5Rear Counterweight Assembly33
6Front Counterweight Assembly
7License Plate Bracket Assembly
8Material Handler11
9Section Supervisor11
Test Run Section Total2121

Overall Total

  • Manpower for 30 units/day: 135 persons
  • Manpower for 40 units/day: 180 persons