This is a manpower allocation plan for a tractor final assembly workshop, covering rear axle, gearbox, case assembly, pre-paint line, painting, and four final assembly lines as well as the test run section. It specifies the required number of personnel for each process when the daily output is 30 units and 40 units respectively. The total manpower needed is 135 people for 30 units per day and 180 people for 40 units per day, ensuring the rational arrangement of personnel to meet production needs.
Tractor Final Assembly Workshop
Manpower Allocation Plan
Rear Axle Section
No.
Process Name
Manpower for 30 units/day
Manpower for 40 units/day
1
Housing Line-on
1
1
2
External Assembly
–
–
3
PTO Shaft Sub-assembly
1
1
4
PTO & Dual Gear Assembly
–
1
5
Dual Gear Sub-assembly
2
2
6
Small Bevel Gear Sub-assembly
–
–
7
Differential Sub-assembly
–
–
8
Left & Right Bearing Housing Bearing Press-fitting
1
2
9
Left & Right Bearing Housing Assembly
–
–
10
Small Bevel Gear Assembly
–
1
11
Main & Driven Gear Clearance Adjustment
–
–
12
PTO & Differential Lock Control Mechanism Assembly
1
1
13
Handbrake Assembly Assembly
–
–
14
PTO Intermediate Shaft Assembly
–
1
15
Top Cover Assembly
–
–
16
Brake, Gear Ring, Left & Right Drive Shaft & Stud Bolt Assembly
2
2
17
Line-off
–
–
18
Planetary Gear Needle Roller Assembly
2
2
19
Planet Carrier Assembly
–
–
20
Drive Shaft Bolt Press-fitting
2
2
21
Drive Shaft Sub-assembly
–
–
22
Transfer Case Assembly
1
1
23
Housing Cleaning (Cleaning time: 1 min)
–
–
24
Material Handler
2
2
25
Team Leader
1
1
26
Section Supervisor
1
1
Total
17
21
Gearbox Section
No.
Process Name
Manpower for 30 units/day
Manpower for 40 units/day
1
Housing Line-on
1
1
2
Parts Rack Line-on
–
–
3
Release Fork Shaft Bushing Assembly
–
–
4
Limit Seat, Rubber Plug & Cup Plug Assembly
–
–
5
Countershaft Assembly & Pressure Plate Assembly
1
1
6
Output Shaft, Reverse Countershaft & Inner Gear Ring Assembly
✅ 1. Equipment Selection & Design Points ✅ 2. Installation & Construction Notes ✅ 3. Safety & Code Requirements ✅ 4. Application Examples ✅ Summary & Recommendation For climbing conveyors running from outdoor to indoor, functional transport is not enough—environmental adaptability and safety are critical. During the design phase, fully consider:
This article details the design and construction of pits and reinforced concrete foundations for conveyor line installation. Pits accommodate drive units, tensioning devices, and maintenance access, with types ranging from shallow trenches to deep excavations requiring ventilation and drainage. Foundation options include spread footings, strip foundations, raft slabs, and pile foundations, selected based on load…
The benefits of using a production line for DC charging piles include increasing production efficiency and reducing costs while ensuring the consistency and reliability of product quality. Automated processes reduce human errors, enhance safety, and allow for quick responses to market changes and customer demands. Moreover, the modular and scaled production helps to lower unit…
Automotive, logistics, appliance and paint plants each rely on three proven conveyors. Cars use power-and-free or ring-guided skids for 0.5-2 t bodies with ±2 mm accuracy. High-speed roller lines with pop-up wheel sorters move 6-8 k cartons per hour in modern DCs. Appliance assembly favours twin-deck speed-chain or triple-belt loops that return empty fixtures on-line…
Standard Operating Procedure (SOP)DC Fast-Charging Pile (DC Charging Station) Assembly Process 1. Scope Applicable to the series production of integrated DC fast-charging piles rated 30 kW – 360 kW. 2. Process Flow & Operating Steps Step Operation Working Instructions & Standards Key Control Points Tools / Equipment 01 Incoming QC Check BOM, verify enclosure, power…
Motorcycle Final Assembly – Detailed Standard Operating Procedure (SOP)Scope: ≤250 cc two-wheel street/dirt motorcycles, 90 s takt, 120 k units/year two-shift Station #10 – Frame Loading1.1 Action: Lift frame onto pallet with electric hoist, align locating pins.1.2 Scan VIN and verify engraving depth ≥0.2 mm, no broken strokes. Station #20 – Engine Pre-assembly2.1 Lift engine…